ENIGMAPARTNERSGLOBAL
HUB

Asset Library

15 assets — core engine, methodology docs, evidence, standard sections, programme plan templates, and lessons learned

Quality Review →
PE-01Engine

Master Playbook

The operating playbook every bid must follow. Includes the 4-stage process (Qualify → Analyse → Draft → Learn), standing rules, team roles, minimum lead times, and the SE P27-0015 benchmark that calibrated this system.

ProcessRulesAll bids
Aug 2026
Tenders/TENDER_ENGINE/PLAYBOOK.md
PE-02Engine

Bid / No-Bid Matrix

10-criteria objective scoring matrix (0-3 each). Score 0-14 = Pass; 15-20 = Assess; 21-27 = Bid; 28-30 = Priority. Includes automatic no-go triggers that override the total score.

Go/No-goDecisionAll bids
Aug 2026
Tenders/TENDER_ENGINE/BID_NO_BID_MATRIX.md
PE-03Engine

ITT Analysis Protocol

How to decode an ITT before drafting. Extracts evaluator rubric from sub-criteria, builds a response map, identifies red flags. The key insight: evaluators follow a rubric — know it or guess.

ITTAnalysisPre-draft
Aug 2026
Tenders/TENDER_ENGINE/ITT_ANALYSIS_PROTOCOL.md
PE-04Engine

Quality Review Checklist

Pre-submission checklist: hard blocks, team quality, methodology, programme plan, case studies, QA narrative. Score prediction. Any hard block = do not submit. Score < 40 = do not submit.

Pre-submissionChecklistQuality gate
Aug 2026
Tenders/TENDER_ENGINE/QUALITY_REVIEW_CHECKLIST.md
L01Methodology

Methodology — AI Strategy

8-week delivery programme. Phase 1: AI Readiness Assessment. Phase 2: Strategy Development. Phase 3: Governance Framework. Phase 4: Implementation Roadmap. Named team: Douglas (lead), Emily (analytical), Glenn (data governance). Frameworks: NIST AI RMF, ISO 42001, EU AI Act.

AI StrategyISO 42001NIST AI RMFEU AI Act
Aug 2026
Tenders/LIBRARY/L01_Methodology_AI_Strategy.md
L02Methodology

Methodology — Cyber Security Advisory

NCSC CAF-structured delivery programme. Phase 1: Current-state Assessment (IEC 62443 OT component by Bobby Hopes). Phase 2: Remediation Planning. Phase 3: Implementation Support. Phase 4: Verification. Named team: Douglas + Bobby Hopes (IEC 62443, DV, CNI).

NCSC CAFIEC 62443NIS RegsISO 27001OES
Aug 2026
Tenders/LIBRARY/L02_Methodology_Cyber_Security_Advisory.md
L03Methodology

Methodology — Digital Workplace

10-week Microsoft 365 / SharePoint delivery programme. Phase 1: Discovery. Phase 2: Solution Design. Phase 3: Implementation. Phase 4: Adoption. Named team: Douglas + Emily. Information architecture, governance, DLP, sensitivity labels, change management.

M365SharePointTeamsDigital Workplace
Aug 2026
Tenders/LIBRARY/L03_Methodology_Digital_Workplace.md
L04Methodology

Methodology — Fractional IT Leadership

Retained fractional IT Director / CIO / CISO engagement model. Month 1: Foundation and audit. Month 2-3: Stabilise. Month 4+: Accelerate. Monthly operating rhythm. Minimum 2 days/month to typical 4-6 days/month. Named lead: Douglas.

FractionalCIOIT DirectorCISORetained
Aug 2026
Tenders/LIBRARY/L04_Methodology_Fractional_IT_Leadership.md
L05Methodology

Methodology — Programme Delivery

Structured programme governance and independent assurance. Phase 1: Mobilisation. Phase 2: Ongoing Governance. Phase 3: Independent Assurance. Phase 4: Programme Reset. Named team: Douglas (programme director, 17 programmes / 8 countries) + Emily (analytical and PM support).

Programme DeliveryGovernanceAssurancePRINCE2MSP
Aug 2026
Tenders/LIBRARY/L05_Methodology_Programme_Delivery.md
L06Evidence

Team Profiles — Bid-Ready

200-word bid-ready profiles for Douglas Trainer, Robert Hopes, Glenn Hunter, Emily Barker. Includes company-level credentials: SC893958, ICO C1969786, HIPR5628739XB1, RM6200 and CSS3 status. Copy verbatim into team sections.

Team ProfilesCVsCredentials
Aug 2026
Tenders/LIBRARY/L06_Team_Profiles_Bid_Ready.md
L07Evidence

Case Study Library

6 anonymised case studies: UAE sovereign technology programme (17 projects, 8 countries), NCSC CAF for water OES operator (Bobby Hopes, 8/12 gaps closed), ISO 27001 Scottish public sector, AI governance professional services, SharePoint digital workplace, GDPR programme. Reference protocol included.

Case StudiesEvidenceTrack Record
Aug 2026
Tenders/LIBRARY/L07_Case_Studies_Library.md
L08Standards

Standard Sections — Reusable Bid Text

Copy-paste sections for: Social Value (PPN 06/20 five themes), Company Overview (100-word boilerplate), QA Narrative, Continuity and Resilience, Data Protection, Insurance, Accreditation Status, Sub-contracting model.

Social ValuePPN 06/20Company OverviewQABoilerplate
Aug 2026
Tenders/LIBRARY/L08_Standard_Sections.md
L09Standards

Quality Governance Framework

The full QA framework underpinning every engagement: quality principles (aligned to Enigma's 6 character values), engagement quality process, deliverable standards, reviewer assignment matrix, client satisfaction process, issue resolution, continuous improvement loop.

QAGovernanceISODelivery Standards
Aug 2026
Tenders/LIBRARY/L09_Quality_Governance_Framework.md
L10Templates

Programme Plan Templates

5 milestone table templates (copy-paste into any bid): Standard 8-week advisory, 12-week cyber assessment + remediation, 90-day fractional IT director, programme governance cadence, AI strategy 8-week roadmap. All formatted as markdown tables with Lead, Deliverable, and Milestone flag columns.

Milestone TablesGanttProgramme PlansTemplates
Aug 2026
Tenders/LIBRARY/L10_Programme_Plan_Templates.md
LL-01LessonsRead first

SE P27-0015 Debrief — AI Scaling

Full post-mortem on all 3 lots of SE AI Scaling 1:2:1 bid (July 2026). Quality: 13.33/60 across all lots. Winner: Insight Direct UK Ltd, 60/60. 4 failure modes identified. Rule changes triggered. What Good Looks Like defined.

SEDebriefPost-mortemLessons
Aug 2026
Tenders/LESSONS_LEARNED/SE_P27-0015_Debrief.md

Files are in the OneDrive project folder. Open directly from Windows Explorer or VS Code. Update library files after every bid outcome.